COPPENHALL INFRASTRUCTURE, CREWE

Since August 2015 McPhillips has provided infrastructure and groundworks for phases 1, 2 & 3 of the new 650 plot Stoneley Park residential development at Coppenhall, Crewe and as of December 2019 300 plots have been handed over. We are due to be on-site until 2025 working flexibly to meet the developer’s build programme. Our activities have included:

  • 80,000m3 earthworks to provide a level site.
  • 11nr rows of 100m long 1500mm diameter pipes at 6m depth for surface water attenuation.
  • 3500m of storm drainage up to 900mm diameter.
  • Construction of 3000m of 4.5m – 6.5m wide estate roads.
  • Pumping station with 4m diameter, 9m deep wet-well.
  • 1km of rising main directionally drilled in Middlewich Street.
  • Section 278 works for off-line construction of a 6-leg traffic island.